Sign In | Join Free | My portofva.com
China SHANGHAI DUBHE ENVIRONMENTAL PROTECTION&TECHNOLOGY CO.,LTD logo
SHANGHAI DUBHE ENVIRONMENTAL PROTECTION&TECHNOLOGY CO.,LTD
Limited Resource; Infinite Cycle.
Verified Supplier

3 Years

Home > MBBR In Wastewater Treatment >

PE38 MBBR And 5-15 Days Membrane Hanging Time For MBBR In Wastewater Treatment

SHANGHAI DUBHE ENVIRONMENTAL PROTECTION&TECHNOLOGY CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

PE38 MBBR And 5-15 Days Membrane Hanging Time For MBBR In Wastewater Treatment

Brand Name : DUBHE

Model Number : MBBR

Certification : ISO

Place of Origin : China

Payment Terms : T/T

Specific gravity : >0.96g/cm³

Application : Wastewater Treatment

Membrane hanging time : 5-15days

Material : HDPE

Efficient surface : >500㎡/m³

void ratio : >95%

PH : 5-15

Specific surface aera : ≥600m2/m3

Specification : φ25*10mm

Contact Now

Optimized Product Description:

The MBBR BioMedia is a high-performance moving bed biofilm reactor (MBBR) carrier designed for advanced wastewater treatment. Manufactured from high-density polyethylene (HDPE), this biodegradable biofilm reactor system ensures superior microbial attachment, enhancing nitrogen removal, organic degradation, and sludge reduction. Ideal for industrial, municipal, and domestic wastewater treatment, our MBBR BioMedia offers durability, high surface area (>500㎡/m³), and long-term efficiency in harsh environments.

Key Features & Benefits

✔ High-Efficiency Biofilm Carrier – Optimized 500+㎡/m³ surface area maximizes microbial growth for faster wastewater purification.
✔ Durable HDPE Material – Resistant to UV, chemicals, and abrasion, ensuring longevity in harsh conditions.
✔ Enhanced Nitrification & Denitrification – Supports slow-growing nitrifying & denitrifying bacteria, improving nitrogen removal efficiency.
✔ Modular & Lightweight Design – Easy to install and retrofit into existing MBBR, MBR, or SBR systems.
✔ Wide pH Tolerance (5-15) – Adaptable to various wastewater compositions without performance loss.
✔ Eco-Friendly & Chemical-Free – Uses natural biofilm processes to degrade pollutants sustainably.

Technical Specifications ( MBBR BioMedia)




PE38 MBBR And 5-15 Days Membrane Hanging Time For MBBR In Wastewater Treatment

Features:

  • Product Name: MBBR In Wastewater Treatment
  • Material: HDPE (High-Density Polyethylene)
  • Membrane hanging time: 5-15 days
  • pH: 5-15
  • Application: Wastewater Treatment
  • Efficient surface: >500㎡/m³
  • Multi-Media-Biofilm-Reactor-System
  • Biodegradable-Biofilm-Reactor-System
  • Biofilm-Based-Reactor-System
  • High-Density-Polyethylene material for durability and longevity
  • High-Efficiency-Wastewater-Treatment for improved water quality

Technical Parameters:

Product Name MBBR In Wastewater Treatment
Material HDPE (High-Density Polyethylene)
Efficient Surface >500 ㎡/m³
Void Ratio >95%
Specific Gravity >0.96 g/cm³
pH Range 5-15
Membrane Hanging Time 5-15 days
Applications Industrial, Municipal, Domestic Wastewater Treatment
Key Features Integrated-Biofilm-Reactor-System, Microbial-Biofilm-Reactor-System, Biofilm-Carrier-Treatment-System
Why Choose Our OEM MBBR BioMedia?

✅ Customizable OEM Solutions – Tailored biofilm carrier designs for specific treatment needs.
✅ Proven Performance – Used in global wastewater projects for BOD/COD reduction & nutrient removal.
✅ Cost-Effective & Low Maintenance – Reduces sludge production & energy consumption.
✅ Compliance with Environmental Standards – Meets EPA, EU, and ISO wastewater regulations.

Frequently Asked Questions (FAQ)

Q1: What is the lifespan of OEM MBBR BioMedia?
A: Our HDPE MBBR carriers last 10+ years due to superior material durability.

Q2: Can this media be used in anaerobic reactors?
A: Yes, it supports both aerobic & anaerobic biofilm processes for complete wastewater treatment.

Q3: How does MBBR improve nitrogen removal?
A








Product Tags:

High Performance MBBR In Wastewater Treatment

      

PE38 MBBR Wastewater Treatment

      
China PE38 MBBR And 5-15 Days Membrane Hanging Time For MBBR In Wastewater Treatment wholesale

PE38 MBBR And 5-15 Days Membrane Hanging Time For MBBR In Wastewater Treatment Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: SHANGHAI DUBHE ENVIRONMENTAL PROTECTION&TECHNOLOGY CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)